As the Prime Contractor, Line-Load performed
generator replacements at the Harry Nice
Bridge Administration and Maintenance
buildings. This project consisted of installing a
300KW generator at the Administration
building, and an 80KW generator at the
Maintenance building. It also included removal
of the existing generators for these two
buildings.
Back
Next
Both of these generator installations included
new concrete pads with sub-base fuel tanks.
Also included was an exterior manual transfer
switch with a feeder tap box for connection to a
future temporary generator if needed. New
emergency battery backup lighting and exit
signs were installed. Local and remote
generator monitoring is included.
301-932-4033
Licensed • Bonded • Insured • MD • VA
Line-Load Electrical Contractors, Inc.
27 Henry Ford Circle, Unit B | Waldorf, MD 20602
301-932-4033 | Fax: 301-932-4035
To report any issues regarding this website, email: Kerry@lineload.net