Governor Harry W. Nice Bridge
Newburg, Maryland

As the Prime Contractor, Line-Load performed generator replacements at the Harry Nice Bridge Administration and Maintenance buildings. This project consisted of installing a 300KW generator at the Administration building, and an 80KW generator at the Maintenance building. It also included removal of the existing generators for these two buildings.
Back
Next
Both of these generator installations included new concrete pads with sub-base fuel tanks. Also included was an exterior manual transfer switch with a feeder tap box for connection to a future temporary generator if needed. New emergency battery backup lighting and exit signs were installed. Local and remote generator monitoring is included.

WYSIWYG Web Builder
301-932-4033
Licensed • Bonded • Insured • MD • VA
Line-Load Electrical Contractors, Inc.
21 Henry Ford Circle | Waldorf, MD 20602
301-932-4033 | Fax: 301-932-4035
To report any issues regarding this website, email: Kerry@lineload.net